{"id":9161,"date":"2014-06-17T17:31:15","date_gmt":"2014-06-17T09:31:15","guid":{"rendered":"http:\/\/www.therocket.com.my\/en\/?p=9161"},"modified":"2014-06-17T17:31:15","modified_gmt":"2014-06-17T09:31:15","slug":"award-to-consortium-a-surprise-but-putrajaya-cirque-de-cronies-not-a-surprise","status":"publish","type":"post","link":"https:\/\/www.therocket.com.my\/en\/award-to-consortium-a-surprise-but-putrajaya-cirque-de-cronies-not-a-surprise\/","title":{"rendered":"Award to consortium a surprise , but Putrajaya &#8220;cirque de cronies&#8221; not a surprise"},"content":{"rendered":"<p><a href=\"http:\/\/www.therocket.com.my\/en\/wp-content\/uploads\/2014\/06\/tony-pua-pua.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft  wp-image-9165\" src=\"http:\/\/www.therocket.com.my\/en\/wp-content\/uploads\/2014\/06\/tony-pua-pua.jpg\" alt=\"tony pua pua\" width=\"449\" height=\"299\" \/><\/a>The RM 3 billion &#8220;surprise award&#8221; of\u00a0<span style=\"color: #000000;\">Gas-Turbine Power Plant \u201cProject 4A\u201d\u00a0to\u00a0YTL Power, SIPP Energy Sdn Bhd and Tenaga Nasional Bhd consortium is proof that the Mahathir era cronyism is alive and well, said Petaling Jaya Utara MP Tony Pua.\u00a0<\/span><\/p>\n<p>Indicating that since YTL Power was edged out by 1MDB to be awarded the\u00a0<span style=\"color: #000000;\">2,000MW coal-fired power plant 3B project in February 2014, Pua explained that the 4A award was meant\u00a0to placate YTL Power as well as SIPP Energy who lost an earlier bid for contracts from the Energy Ministry.\u00a0SIPP Energy Sdn Bhd is a company associated with the Sultan of Johor.\u00a0<\/span><\/p>\n<p><span style=\"color: #000000;\">&#8220;This time, the award was not only directly negotiated, the terms of the award was vague, unspecific and flimsy, as if it was conducted in an absolute hurry.<\/span><span style=\"color: #000000;\">\u00a0\u00a0<\/span><span style=\"color: #000000;\">Neither the size of the plant was not fixed nor was the exact tariffs finalised,except to say that it must be \u201ccomparable to the last tender exercise\u201d,&#8221; Pua said.\u00a0<\/span><\/p>\n<p>Yesterday, TNB had attempted to duck out of responsibility in the project, saying that no prior discussions were had with\u00a0<span style=\"color: #000000;\">any parties regarding the matter. TNB CEO Azman Mohd had refuted claims of being part of the consortium.\u00a0<\/span><\/p>\n<p><span style=\"color: #000000;\">&#8220;It is shocking how the Energy Commission has proceeded to make an award for a 20 year concession to a group of companies that didn\u2019t even know that they are going to be working together!&#8221; said Tony Pua.\u00a0<\/span><\/p>\n<p>Calling the suspicious awarding of the 4A award a &#8220;circus&#8221; by the Federal government, Tony said that the government was rewarding the consortium for keeping mum about the 1MDB bailout.<\/p>\n<p><span style=\"color: #000000;\">&#8220;We will take good care of you, even at the expense of the rhetoric behind Najib\u2019s \u2018New Economic Model\u2019\u00a0<\/span><\/p>\n<p><span style=\"color: #000000;\">&#8220;As long as you scratch my back, I will continue to scratch yours,&#8221;said Pua.\u00a0<\/span><\/p>\n<p><span style=\"color: #000000;\">In February this year, the Federal Government bailed out 1Malaysia Development Berhad (1MDB) with the award of a RM11 billion 2,000MW coal-fired power plant in February 2014 despite the company not submitting the lowest tariff for the tender exercise which attracted 7 participants.\u00a0<\/span>Though YTL Power had submitted a qualified and cheaper competing bid compared to 1MDB to supply electricity to TNB, 1MDB was awarded the project. According to Tony Pua, the electricity tariffs\u00a0would be raised as a result of the 1MDB bailout.<\/p>\n<p><span style=\"color: #000000;\">&#8220;When the electricity tariffs for consumers are \u201cforced\u201d to be raised in the near future, the Prime Minister Dato\u2019 Seri Najib Razak will just deny all culpability by the Government has \u201cno other option\u201d but to do so,&#8221; said Tony Pua.\u00a0\u00a0-The Rocket<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The RM 3 billion &#8220;surprise award&#8221; of\u00a0Gas-Turbine Power Plant \u201cProject 4A\u201d\u00a0to\u00a0YTL Power, SIPP Energy Sdn Bhd and Tenaga Nasional Bhd consortium is proof that the Mahathir era cronyism is alive and well, said Petaling Jaya Utara MP Tony Pua.\u00a0 Indicating that since YTL Power was edged out by 1MDB to be awarded the\u00a02,000MW coal-fired power [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[274],"tags":[],"class_list":["post-9161","post","type-post","status-publish","format-standard","hentry","category-national"],"_links":{"self":[{"href":"https:\/\/www.therocket.com.my\/en\/wp-json\/wp\/v2\/posts\/9161","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.therocket.com.my\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.therocket.com.my\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.therocket.com.my\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.therocket.com.my\/en\/wp-json\/wp\/v2\/comments?post=9161"}],"version-history":[{"count":3,"href":"https:\/\/www.therocket.com.my\/en\/wp-json\/wp\/v2\/posts\/9161\/revisions"}],"predecessor-version":[{"id":9170,"href":"https:\/\/www.therocket.com.my\/en\/wp-json\/wp\/v2\/posts\/9161\/revisions\/9170"}],"wp:attachment":[{"href":"https:\/\/www.therocket.com.my\/en\/wp-json\/wp\/v2\/media?parent=9161"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.therocket.com.my\/en\/wp-json\/wp\/v2\/categories?post=9161"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.therocket.com.my\/en\/wp-json\/wp\/v2\/tags?post=9161"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}